Monday, December 19, 2011

Weekly Construction Update

The work on our house is moving along. Here's how it looks after week 2:

Facing West:


Facing South:


Facing East:


Facing North:


Here's a picture of what will someday be the downstairs rec room...both of the windows you can see on the far side will be part of that room:


And in this picture you can see from the corner what will someday be a bedroom, with the window on the right. The downstairs bathroom will be along that pipe same side:


Here the two windows on the left will be two downstairs bedrooms, and the blank space to the right eventually a utility/storage area:


Finaly, here's a picture of what will be the garage:

2 comments:

Unknown said...

Hooray the house. :)

That's a lot of bedrooms in the basement - will there be any upstairs?

Gary said...

The basement will be unfinished when we move in. Eventually there will be 3 bedrooms downstairs, and there will be 4 upstairs before we move in.

So, when the house is complete it will be 7 bed 3 1/2 bath, but that probably won't be for 5-10 years out.